You bid a job. You lose it — or worse, you win it and lose money. Nine times out of ten, one of these line items is missing.
- Soil testing. $1,500–$3,000. Skip it and you own every foundation problem for the next decade.
- Utility connection fees. Water, sewer, electric hookup. Utility company invoices.
- Debris removal / dumpster rental. $300–$800 per dumpster; a residential remodel eats 3–8.
- Temporary power. Framing has to happen before the panel is set.
- Sales tax on materials. Depends on state. If you don't have a resale certificate, add 6–10%.
- Change-order buffer. If your bid doesn't have a 5–10% contingency line, you're bidding scared.
- Warranty period labor. Include it in overhead, not as a line item.